Our Water Project

Baie du Tombeau Sewerage Project, PHASE III – Feasibility Study (FS), EIA, Detailed Design, Bidding Documents for Networks & Pumping Stations and upgrading of Existing Wastewater Treatment Plant

The obtention / collection, analysis and interpretation of all relevant data,

(ii) design of the reticulation network including pumping stations following hydraulic modelling using SewerCAD,

(iii) meetings with relevant concerned authorities;

(iv) identification of environmental impacts and mitigation measures;

(v) preparation of an Environmental Management Plan;

(vi) preparation of an Environmental Monitoring Plan;

(vii) preparation of an EIA Report for obtention of the required EIA licence;

(viii) assistance in preparation of bid documents and evaluation of bids

from 2011-2012

  • Baie-du-tombeau